A solution shaped around your work.
Migration can affect user access, scheduled jobs and connected applications even when the main software appears unchanged. Mapping these dependencies and testing the destination helps establish a sequence that business owners can review before the cutover.
What this service covers
- Source workload and dependency discovery
- Destination readiness and compatibility testing
- Data transfer and cutover coordination
- Application acceptance and rollback planning
We confirm the selected equipment, responsibilities and deliverables in your project proposal before work begins.
How we deliver the work
- 01
Assess the environment
Review the site, connected devices, existing configuration and application dependencies. Identify the physical access and operational constraints that affect the work.
- 02
Plan and implement
Agree the design, equipment compatibility and change window. Carry out the installation or configuration with a clear record of the agreed changes.
- 03
Verify and hand over
Check the relevant connections and business functions against the agreed scope. Record results, remaining dependencies and the information needed for ongoing administration.
A clear handover
Agree the records your team needs to operate and maintain the solution. Depending on the selected scope, these can include:
- Relevant configuration and equipment records
- Agreed functional checks and findings
- Administration guidance and support responsibilities
What to prepare for your project
Provide source and destination specifications, application contacts, data volumes and permitted change windows so migration stages, testing responsibilities and fallback options can be agreed.
Discuss this serviceYour questions, answered
Should the old server be removed immediately after migration?
Retirement should follow agreed acceptance checks, backup verification and a defined fallback period. Keeping an uncontrolled duplicate active can also cause problems, so the old environment needs an explicit isolation and decommissioning plan.
What information helps plan network capacity?
Share a floor plan, user count, connected devices and business applications. Include planned cameras, access points and IP phones so connections, power and network separation can be considered together.
How will the agreed installation be checked?
Define the relevant connection and application checks before work starts. Ask for labels, configuration records and test findings appropriate to the scope so your team can manage later changes.
How do we prepare for work on an existing system?
Identify the system owner, authorized administrator and critical applications. Confirm available backups and any change window before work begins. Access credentials should be exchanged only through an agreed secure method, never in the enquiry form.